ConstructionsToday

Ant Yapi wins Folkestone flats and Leas Pavilion job

Developer Gustavia is bringing forward the 90 luxury flats scheme which will also secure the future of the 1902-built Leas Pavillion, which has operated as a tea room, theatre, cinema, bowling alley, snooker hall and nightclub, but fallen into disrepair.

Gustavia’s appointed contractor, prime residential specialist Ant Yapi UK, is scheduled to commence work this month.

The pavilion restoration is expected to cost around £4m alone.

vac uk new september

Preservation work will initially involve the pavilion’s distinctive terracotta outer façade, with each stone being painstakingly removed and transported off-site for cleaning and refurbishment.

Where original features cannot be removed, moulds and samples will be taken of ceilings, walls, and arches around column crowns to recreate original interior designs.

image 2 4

How the restored tea room will look

Selahattin Yalcin, development director at Gustavia, said: “We are delighted to receive final pre-commencement permissions for this incredibly exciting project for Folkestone.

“It’s taken 18 months of hard work to get to this stage. Every step we’ve taken has been in conjunction with the relevant council authorities and our appointed architect Hollaway, structural engineer Manhire, and services engineer Hoare Lea.

Screenshot 2022 06 10 at 07.26.52

New apartment block will sit about the Leas Lift cliff funicular railway

DRS Construction Enquirer MPU July 2020 st3C
259 PERI AD DIGI CE MPU 2 MAY 22 AW

Source link

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button